Mazda 3 since 2003
1. Operation and maintenance of the car
2. Engine
3. Transmission
4. Running gear
5. Steering mechanism
6. Brake system
7. Onboard electric equipment
8. Body
8.1. General information
8.2. Hinged components of a body
8.3. Body glazing
8.4. Seats
8.5. Conditioner and heater
8.5.1. Coolant
8.5.2. Air filter
8.5.3. Block of the air conditioning system
8.5.4. Evaporator
8.5.5. Broad valve
8.5.6. Condenser
8.5.7. Check of a radiator of a heater
8.5.8. Removal and installation of a back air duct
8.5.9. Removal and installation of the compressor of the air conditioning system
8.5.10. Dismantling and assembly of the obgonny coupling
8.5.11. Adjustment of the obgonny coupling
8.5.12. Check of the obgonny coupling
8.5.13. Removal and installation of the condenser
8.5.14. Check of the condenser
8.5.15. Removal and installation of lines of coolant (LF)
8.5.15.1. Removal
8.5.15.2. Separation of the isolating joint
8.5.15.3. Installation
8.6. Tables
 










d925ae9b

8-5-15-3-ustanovka.html

8.5.15.3. Installation

Apply compressor on sealing rings and connect tubes.
Delay connections.
Tighten a bolt of connection of the isolating joint manually.

Fig. 8.82. Connection of pipes with the isolating joint


For connection of tubes with the isolating joint clamp the covering party of a tube flat-nose pliers or the similar tool, and then tighten a connecting bolt or a nut a dynamometer key (fig. 8.82).
Attach the covered tube or a hose twisting it in the covering part until the spring on the covered tube does not appear behind a bell of the covering tube.
Execute operational tests of a contour of cooling.

NOTE
When replacing of the covered tube or hose emergence after connection of a ring of the indicator indicates that connection is blocked.

"previous page
8.5.15.2. Separation of the isolating joint
following page"
8.6. Tables