Mazda 3 since 2003
1. Operation and maintenance of the car
2. Engine
2.1. General description of new engines of the L8, LF and L3 models
2.2. Mechanical part of engines
2.2.1. Engines of the L8 and LF models
2.2.2. Verification of the contents of CO/CH in the fulfilled gases
2.2.3. Measurement of a compression in engine cylinders
2.2.4. Check of a belt of the drive of auxiliary units
2.2.5. General information and safety measures at removal of the power unit
2.2.6. Removal of sealant
2.2.7. Removal and installation of the power unit
2.2.8. Check of the executive mechanism of change of phases of gas distribution (L3)
2.2.9. Removal and installation of the executive mechanism of change of phases of gas distribution (L3)
2.2.10. Gas distribution mechanism drive chain
2.2.11. Removal and installation of the operating oil valve (OCV) (L3)
2.2.12. Check of the operating oil valve (OCV) (L3)
2.2.13. Check of operation of the spool-type valve (OCV) (L3)
2.2.14. The general repair operations on the power unit
2.2.15. Check of a head of the block of cylinders
2.2.16. Assembly of the block of cylinders (beginning)
2.2.16.1. Installation of covers of radical bearings
2.2.16.2. Installation of piston rings
2.2.16.3. Assembly of the piston
2.2.16.4. Installation of the conrod bearing and cover
2.2.16.5. Assembly of the balancing block (L3 with the mechanism of change of phases of gas distribution)
2.2.17. Assembly of the block of cylinders (termination)
2.2.18. Assembly of a head of the block of cylinders
2.2.19. Assembly of the drive of the mechanism of gas distribution
2.3. Appendix 1
2.4. Appendix 2
2.5. Appendix 3
2.6. The Z6 engine – a mechanical part
2.7. Lubrication system
2.8. Cooling system
2.9. System of an admission
2.10. Fuel system
2.11. System of production of the fulfilled gases and system of decrease in toxicity
2.12. System of ignition
2.13. Control system
2.14. Tables
3. Transmission
4. Running gear
5. Steering mechanism
6. Brake system
7. Onboard electric equipment
8. Body
 










d925ae9b

2-2-16-5 - sborka - balansirovochnogo - bloka - l3 - with - mekhanizmom-izmeneniya-faz-gazoraspredeleniya.html

2.2.16.5. Assembly of the balancing block (L3 with the mechanism of change of phases of gas distribution)

Make sure that the gear wheel of the balancing block has no damages, be also convinced of smoothness of rotation of a shaft.

ATTENTION
The balancing block is not subject to dismantling as has high precision of production.

Turn a bent shaft clockwise and install the piston of the first cylinder in the provision of VMT.
Establish adjusting laying on the landing surface of the balancing block.

Fig. 2.177. Tags of the balancing block


Install the balancing block on the block of cylinders, previously having established tags of the balancing block from above in the center (fig. 2.177).

Fig. 2.178. Rotation of a balansirovchny shaft by means of the screw-driver


Insert the screw-driver into a bent shaft in the field of the first counterbalance, carry out rotation and application of axial effort to the crankshaft the screw-driver, working with it as the lever, as shown in the figure 2.178.

Fig. 2.179. Measurement of a gap in gear gearing of a shaft of the conducted gear wheel


Install special adaptation, as shown in the figure 2.179, then measure a gap in gear gearing, using the indicator of hour type.
If the gap exceeds the specified size, again measure it and, using the table of the choice of adjusting laying, choose the corresponding laying, according to the following procedure.

ATTENTION
At measurement of a gap turn a bent shaft on one whole revolution and check compliance of a gap to norm in the following six provisions: 10 °, 30 °, 100 °, 190 °, 210 °, 280 ° after VMT.

Gap size in gear gearing: 0,005–0,101 mm.
Using the main adjusting laying (number 50), install the balancing block on the block of cylinders, and then measure a gap.
Choose adjusting laying according to result of measurements.
Install the chosen adjusting laying on the balancing block, then install the balancing block on the block of cylinders.

"previous page
2.2.16.4. Installation of the conrod bearing and cover
following page"
2.2.17. Assembly of the block of cylinders (termination)